Vuelva a Asturias - return to Asturias 🇪🇸
When I got back home after my last visit to Spain, in September last year, I totted up all what I'd seen and what I'd missed and resolved to go back in 2012 to rectify some of the misses. They were, in no particular order
- FEVE coal trains to Soto de Ribera and/or Guardo power stations
- Aluminium trains on the Gijon-Ferrol line west of Pravia
- La Maruca Yard in Aviles
- Iron Ore on the broad gauge Arcelor-Mittal (ex-ENSIDESA) railway between Aviles and Abono
- the line through the Nalon Valley between Pravia and Trubia
- the line between Pravia and Aviles
- the former Langreo Railway between Gijon and El Berron
- the Ponferrada and Villablino (metre gauge, operated by coal mining company, Coto Minero Cantábrico)
I managed some of these, I also contrived to miss a few so it looks like another visit is on the cards :-)
Read More- FEVE coal trains to Soto de Ribera and/or Guardo power stations
- Aluminium trains on the Gijon-Ferrol line west of Pravia
- La Maruca Yard in Aviles
- Iron Ore on the broad gauge Arcelor-Mittal (ex-ENSIDESA) railway between Aviles and Abono
- the line through the Nalon Valley between Pravia and Trubia
- the line between Pravia and Aviles
- the former Langreo Railway between Gijon and El Berron
- the Ponferrada and Villablino (metre gauge, operated by coal mining company, Coto Minero Cantábrico)
I managed some of these, I also contrived to miss a few so it looks like another visit is on the cards :-)
12 / 66
The westbound freight followed shortly after, descending from the Nalon to Trubia, where the engines will run round for the final leg to Pravia, where remarshalling takes place.
- No Comments